Prefab house installation attention

2024-06-02 17:28

What should be paid attention to in the house installation project? Be sure to pay attention to waterproofing and moisture-proofing.


1. Indoor storage: When the conditions on the construction site allow and there are not many insulation materials at present, the insulation materials can be stored indoors. In order to prevent the increase of air humidity brought by rainy weather from affecting the materials, the indoor windows should be blocked to prevent rain. The materials are piled 30 cm above the ground and covered with rain cloth to prevent water accumulation on the upper floors due to rainy weather, which will seep into the stored materials and cause the modified insulation materials to harden.


2. Outdoor storage of integrated houses: Choose a place with high terrain to pile up materials, with clear drainage around, not easy to accumulate water, and more than 30 cm above the ground. Before piling, lay a layer of rain cloth on the material table to prevent moisture. After piling, cover it with a complete rain cloth, tie it with a rope, and press the rain cloth tightly around with heavy objects. Pay attention to weather changes, wait until it is sunny, open the rain cloth for drying, evaporate the water from the rain cloth, and prevent the water vapor from forming water droplets, which drip on the inorganic active insulation material and cause hardening.


Get the latest price? We'll respond as soon as possible(within 12 hours)
  • Required and valid email address
  • This field is required
  • This field is required
  • This field is required
  • This field is required