Disaster rescue structure
2024-07-18 17:12
It can be 8 degrees of earthquake, can prevent typhoon 9, the roof bearing snow 1 meter, this is because galvanized steel light and strong, is a good building material.
The original intention of the active board room is used as a temporary building, so it has not been strictly designed and tested as traditional buildings as traditional buildings. This means that when an earthquake occurs, the active board room may show poor seismic performance.
Get the latest price? We'll respond as soon as possible(within 12 hours)