Integrated house producing progress

2024-05-25 10:56

    The first step in manufacturing integrated houses is customer demand analysis. Different uses require different product specifications. The market increasingly requires non-standard personalized products rather than completely unified similar items, so it must be based on customer requirements. The specific requirements are strictly analyzed。


    The second part is the drawing design of the integrated house. This part is also the most important. Strict and professional design will bring great convenience to production and will not cause waste of various materials. ;Then comes the production of materials, or some manufacturers directly ask suppliers to produce and purchase various detailed parts。


     The third step is the installation of integrated houses, which can be installed directly at the factory or at the use site. This Part one requires on-site guidance from technical personnel and supervision and inspection by personnel (or a third party); the last step is the acceptance test of the integrated house. The human and financial resources required for the entire process must be budgeted in advance to support its orderly progress.

Get the latest price? We'll respond as soon as possible(within 12 hours)
  • Required and valid email address
  • This field is required
  • This field is required
  • This field is required
  • This field is required