Container for disaster

2024-08-04 17:28

   The raw materials for the construction are often renewable

The original intention of the active board room is used as a temporary building, so it has not been strictly designed and tested as traditional buildings as traditional buildings. This means that when an earthquake occurs, the active board room may show poor seismic performance.

Get the latest price? We'll respond as soon as possible(within 12 hours)
  • Required and valid email address
  • This field is required
  • This field is required
  • This field is required
  • This field is required